OPC Head Office Ives Rd Altona NthCorporate/Divisional Milestones

OPC commenced trading as a Company in 1998 when Phil Dent, after 20 years practical experience in all facets of the Australian Offshore Oil & Gas Exploration Industry, decided to branch out on his own and develop a company that would ultimately provide an all encompassing Support Service to Australian Oil /Gas Explorers/Producers.

Container Division

The initial activities of the fledgling company were centred around the design, manufacture and supply of Offshore Containers

  • Jun 1998 - Manufacture and supply the FIRST EVER in Australia offshore Container to DNV Certification 2.7-1
  • Jun 1998 - 80 tonne Vertical test Gantry commissioned at our Altona Site
  • Jul 2000 - 100th DNV Certified container supplied to the Industry
  • May 2002 - Applied for NATA Accreditation(s) ISO/IEC 17025 Mechanical testing and ISO/IEC 17020 Inspection Activities
  • Apr 2004 - 300th DNV Certified Container supplied to the industry
  • Jan 2006 - 50th design Approval granted by DNV
  • Aug 2006 - 500th DNV Certified Container manufactured and supplied to the Industry
  • Jan 2008 - Fabrication of Mud Pump Skid for International Sea Drilling
  • Sep 2008 - Design & Manufacture for Bootlocker (OPC 6000) for Esso Australia
  • Oct 2009 - Design & Manufacture Combination Laundry Bootroom (OPC 6003) for PSN Australia
  • Dec 2009 - Expanded into new premises in Altona North
  • Jan 2010 - Manufacture Sea Water Air Lift Baskets
  • Mar 2010 - Design & Manufacture Garnet Hopper & Frame combinations
  • May 2010 - OPC gained "Australian Made" approval
  • Sep 2010 - 900th DNV Certified Container manufactured and supplied to the industry.

Rigging Division

In line with the almost immediate success of the Container Division, the natural progression was to develop a rigging Division that not only supplied the lifting sets to our Company owned equipment, but also met the ancillary rigging needs of our Container Division clients.

  • Feb - 2001 Supply of 20 tonne portable Load Cell for Onsite testing
  • Nov - 2002 Successfully gained NATA Accreditation(s) ISO/IEC 17025 Mechanical Testing and ISO/IEC 17020 Inspection Activities
  • May - 2003 Supply and Installation of 150 Tonne Horizontal Test Bed
  • May - 2003 First OPC Rigging Division Lifting Sets supplied
  • Mar - 2004 500th Certified Sling Set manufactured for supply
  • Jul - 2005 50 Tonne Portable Load Cell introduced
  • May - 2006 1000th Certified Sling Set manufactured for supply
  • Jan - 2007 OPC make significant advances to have all lifting equipment certified to DNV2.7-1 standards. On target to "lead the field" in this achievement
  • Jul 2008 - 220 tonne of Water Weight Bags introduced
  • Mar 2009 - 400 tonne Horizontal Test Bed commissioned
  • May 2010 - OPC achieves Self Certification for Lifting Equipment certified to DNV 2.7-1 Standards

Supply Bases

As a result of requests from our existing client base, OPC made the commitment to our clients to extend our services to include the provision of Supply Base facilities.

Significant Projects at Port Melbourne, Victoria include  

  • Jan 2004 - OPC Supply base commissioned at 27, 28 & 29 South Wharf, Port Melbourne, Victoria
  • Mar 2004 - OPC entered into agreement with origin Energy resources Ltd to provide Supply Base Services for the "Yolla" Joint Venture
  • Sep 2004 - OPC entered into 6 month agreement with Apache energy to provide Supply Base Services
  • Apr 2005 - OPC enters into agreement with Upstream Petroleum / Anzon/nexus to provide Supply base Services to the "Basker-mantra" Drilling program
  • May 2005 - OPC successfully completes "Yolla" Program
  • Oct 2006 - OPC successfully completes the "Basker-Mantra" Drilling Program
  • Dec 2006 - OPC has the "Basker-mantra" agreement extended to include all production requirements
  • Jun 2008 - Mobilisation of Nor Sea for Benthic Geotech
  • Jul 2008 - Sea Fastenings Project for Atlant Frauke/Rem Etive
  • Nov 2008 - Crystal Ocean Shut Down Project
  • Dec 2008 - Mobilisation of Neptune Trident
  • Jan 2009 - Supply Base support to Esso Ethane Pipeline repairs
  • Aug 2009 - Supply base support services to Kan Tan IV Drilling Campaign in Victorian Waters
  • Oct 2009 - Heavy Lift vessel to vessel transfer of 140T PV for West Tuna
  • Mar 2010 - Supply Base support services to Origin Energy Rockhopper Drilling program
  • Jun 2010 - Rem Etive mobilisation under Esso
  • Jun 2010 - Crystal Ocean Shutdown Project
  • Jul 2010 - Mobilisation of Subsea Flow Base for Kipper Tuna and Turrum Phase 2
  • Dec 2010 - Receive & assist in fit out of Subsea trees for Kipper Tuna Turrin project

Barry Beach, Victoria  

As it became clear that our predominant area of involvement was in the Gippsland / Bass Strait Oil and Gas fields, the decision was made to increase our exposure and facilities to that region.

Significant Projects at Barry Beach include:-

  • May 2003 - 3.5 hectare property purchased at Barry Beach, Victoria, opposite Esso Barry Beach Marine Terminal.
  • Jul 2003 - Refurbished and re-equipped Engineering Workshop at Barry Beach Supply Base
  • Jan 2004 - Yard levelling, sandblasting area and office accommodation completed
  • Oct 2005 - Washdown bay for Pipe Inspection / Cleaning completed
  • Oct 2006 - Mobilise Nabors Rig 175 from New Zealand and Houston for erection and testing at OPC Barry Beach site, prior to handover to Esso
  • Jul 2007 - Demobilise Nabors Rig 453
  • Sep 2007 - Fabricate A-Frame for Pacific Protector
  • Dec 2007 - Modifications to Nabors Rig 175, including new exhaust Suit case for Generator package
  • May 2008 - 75T Crawler Crane purchased for onsite work
  • Mar 2009 - Commissioning of 150T Horizontal Test Bed
  • Jun 2009 - PSN Ballast Weight Fabrication Project
  • Jan 2010 - Pipe Storage Shed added to facility to better protect Customer's stored assets
  • Jan 2010 - Work commences on installation of 150 tonne Horizontal Test bed at Barry Beach Site
  • Jul 2010 - Support services for PSN Anode Sled replacement Program
  • Oct 2010 - Successfully gained NATA accreditation ISO/IEC 17025
  • Oct 2010 - Rig 175 Rig Move to OPC Yard
  • Nov 2010 - Fabricate Bridge Bearing Pallet for KTT Project
  • Dec 2010 - Refurbishment & Mobilisation of Halliburton Bog Plant
  • Mar 2011 - Fabricate Halliburton Cement Unit Transport Skip
  •            

Transport & Projects Division

Significant projects include:-

  • 1998 - 2010 - Over 60,000 tonnes of over-dimensional reels of conveyor belting transported (without incident) to remote mining and exploration sites around Australia
  • May 2005  - Successfully completed transport, Logistics and Supply base services for the laying of the Basslink Cable for Pirelli
  • 2004 - 2005 - Under Origin Energy Resources Ltd "Yolla" Joint Venture completed all transport requirements including multiple "hot shots", in full / on time, Australia wide
  • Nov 2005 - Purchased DAF Cab & Chassis vehicle specifically designed to accommodate the needs of Hot Shots for the Oil & Gas Industry & Dangerous Goods
  • Jun 2006 - OPC mobilises Rig 647 from Dampier, WA to OPC Supply Base, Melbourne and forwards to Port Taranaki, New Zealand on chartered vessel
  • Sep 2006 - Purchased double drop deck semi trailer specifically designed for transportation of heavy lifts for the industry
  • Oct 2006 - In full/on time outcome achieved on transport requirements for Basker-Mantra Drilling program Australia wide
  • Oct 2006 - Successfully completed the mobilisation via Vessel sole charter (2 voyages), of Rig 175, Port Taranaki, NZ to Esso BBMT at Barry Beach, Victoria
  • Nov 2006 - Mobilised ancillary equipment via Vessel sole charter for Rig 175 from Nabors Houston to Esso BBMT
  • Oct 2007 - SWG Eden Mobilisation
  • Oct 2007 - Calypso Star ROV Spread Mobilisation
  • Nov 2007 - Calypso Star Demobilisation
  • Mar 2008 - Successfully mobilised test Package, Expro Group Darwin to Expro New Plymouth, NZ
  • Apr 2008 - Successfully transported 1930 tonnes pipe, Melbourne to Barry Beach
  • May 2008 - Basker 6 Demobilisation at Eden, NSW
  • Jul 2008 - Nexus Subsea Tree Move
  • Aug 2008 - Rem Etive Mobilisation # 2 & 3 at Eden, NSW
  • Aug 2008 - Pontoon Salvage Recovery Operation - Atlant Frauke
  • Sep 2008 - Demobilisation Expro Group Test Package New Plymouth NZ, to Darwin
  • Sep 2008 - Demobilisation of Rem Etive at Eden, NSW
  • Oct 2008 - Demobilisation Expro Group Test Package 2 New Plymouth NZ, to Darwin
  • Jul 2009 - Rig Refurbishment of "Kan Tan IV" at Lascelles Wharf, Geelong
  • Nov 2009 - Replacement of anchor chains for Ocean Patriot at Lascelles Wharf, Geelong
  • Dec 2009 - Ocean Patriot Mooring System Program
  • May 2010 - Under contract with Advent Energy, set up temporary supply base in Newcastle, NSW
  • Jun 2010 - Purchased heavy transport prime mover & low-loader trailer
  • Dec 2010 - Transport & lift of 160 Tonne manifold at Webb Dock